Rational energy consumption and refurbishment of bigger pumps

  • Determination of existing situation (site testing, reverse engineering, CFD simulations, analysis...)
  • Proposals for improvements (hydraulic and mechanical development, CFD simulations, model testing,...)
  • Realisation (design, production, assembling, installation, putting in operation, confirmation by testing).

Options:

  • replacement of impeller,
  • replacement of other pump hydraulic parts,
  • replacement of pump,
  • replacement of pumping unit (pump + driver),
  • improved operation instructions.